Masthead header

Studio Update – Day 5

I’ve not posted any updates for a few days as I was struck down with a near fatal dose of man flu, but feeling much better now.

Anyway there was a really buzz in the studio on Friday as we had a lot of different trades in working on various aspects of the build.  Having decided to remove part of the upstairs floor to create additional headroom height in the studio the carpenters set about cutting back the floor.  Whilst this has created additional work as we will need to repair the ceiling, it has made the most dramatic impact on the studio space.

These pictures were taken on Friday morning.

 

Since then the electricians have finished the first fix electrics and we now have lights in the building.  All the stud work is complete and ready for the plasterers and we have now started working on the upstairs space which will become a dedicated Photoshop area and office space.

Your email is never published or shared. Required fields are marked *

*

*

There was an error submitting your comment. Please try again.

T w i t t e r
F a c e b o o k